Millstone kärnkraftverk
Millstone kraftverk | |
---|---|
Land |
|
Plats | Waterford , New London County , Connecticut |
Koordinater | Koordinater : |
Status | Operativ |
Bygget började |
Enhet 1: 1 maj 1966 Enhet 2: 1 november 1969 Enhet 3: 9 augusti 1974 |
kommissionens datum |
Enhet 1: 1 mars 1971 Enhet 2: 26 december 1975 Enhet 3: 23 april 1986 |
Avvecklingsdatum | Enhet 1: 1 juli 1998 |
Konstruktions kostnader | 8,845 miljarder USD (2007 USD, endast enheter 2–3 ) |
Ägare | Dominion Energy |
Operatör(er) | Dominion Energy |
Kärnkraftverk | |
Typ av reaktor |
Enhet 1: BWR Enhet 2–3: PWR |
Reaktorleverantör |
Enhet 1: General Electric Enhet 2: Combustion Engineering Enhet 3: Westinghouse |
Kylkälla | Long Island Sound |
Termisk kapacitet |
1 × 2011 MW th (avvecklad) 1 × 2700 MW th 1 × 3650 MW th |
Kraftproduktion | |
Enheter i drift |
1 × 869 MW 1 × 1229 MW |
Märke och modell |
Enhet 1: BWR-4 (Mark 1) Enhet 2: CE 2-loop (DRYSUB) Enhet 3: WH 4-loop (DRYSUB) |
Enheter avvecklade | 1 × 641 MW |
Namnskyltens kapacitet | 2098 MW |
Kapacitetsfaktor |
89,99 % (2017) 71,23 % (livstid) |
Årlig nettoproduktion | 17 216 GWh (2021) |
externa länkar | |
Hemsida | Millstone kraftverk |
Commons | Relaterade medier på Commons |
Millstone Nuclear Power Station är det enda kärnkraftverket i Connecticut och det enda kärnkraftverket med flera enheter i New England . Det ligger vid ett före detta stenbrott (från vilket det har fått sitt namn) i Waterford . Med en total kapacitet på över 2 GW producerar stationen tillräckligt med el för att driva cirka 2 miljoner hem. Driften av Millstone Power Station stöder mer än 3 900 jobb och genererar motsvarande över hälften av den el som förbrukas i Connecticut.
Millstone-platsen täcker cirka 500 tunnland (2 km²). Kraftproduktionskomplexet byggdes av ett konsortium av kraftverk som använder Long Island Sound som en källa för sekundär sidokylning. Millstone Units 2 och 3, båda tryckvattenreaktorer (en från Westinghouse och en från Combustion Engineering ), såldes till Dominion Resources av Northeast Utilities 2000 och fortsätter att fungera.
Anläggningen har haft ett flertal säkerhetsrelaterade avstängningar och ibland fått förstärkt undersökningsstatus av Nuclear Regulatory Commission . 1999 Northeast Utilities , anläggningens dåvarande operatör, med på att betala 10 miljoner dollar i böter för 25 fall av ljugit för federala utredare och för att ha förfalskat miljörapporter. Dess dotterbolag, Northeast Nuclear Energy Company, betalade ytterligare 5 miljoner dollar för att ha gjort 19 falska uttalanden till federala tillsynsmyndigheter angående främjandet av okvalificerade anläggningsoperatörer mellan 1992 och 1996.
Den 28 november 2005, efter en 22-månaders ansöknings- och utvärderingsprocess, beviljades Millstone en 20-årig licensförlängning för både enhet 2 och 3 av NRC.
Licenshistorik och milstolpar
Enhet 1
Millstone 1 var en General Electric kokvattenreaktor , som producerade 660 MWe , stängdes av i november 1995 innan den stängdes permanent i juli 1998.
- Bygglov utfärdat: 1966-05-19
- Slutlig säkerhetsanalys inlämnad: 1 november 1968
- Provisoriskt drifttillstånd utfärdat: 7 oktober 1970
- Heltidsdriftstillstånd utfärdat: 31 oktober 1986
- Fullständig licens: 7 oktober 1970
- Inledande kritik: 26 oktober 1970
- Synkroniserad till nätet: november 1970
- Kommersiell verksamhet: 28 december 1970
- 100 % effekt: 6 januari 1971
- US Nuclear Regulatory Commission inledde en säkerhetsutredning angående tankningsprocedurer, baserad på information från George Galatis , en senior kärnkraftsingenjör, 1995.
- Läckande ventil tvingad avstängning flera utrustningsfel upptäcktes: 20 februari 1996
- Permanent upphörd verksamhet: 21 juli 1998
Enhet 2
Millstone 2 är en förbränningsteknisk tryckvattenreaktoranläggning byggd på 1970-talet och har en maximal effekt på 2700 termiska megawatt, eller MWth (870 MWe). Den har 2 ånggeneratorer och 4 reaktorkylningspumpar. Det genomgår en uppgradering av sitt säkra avstängningssystem som redan uppfyllde NRC-standarderna. Under tankningsavbrottet i oktober 2006 installerade operatören en ny tryckanordning.
- Bygglov utfärdat: 11 december 1970
- Slutlig säkerhetsanalysrapport inlämnad: 15 augusti 1972
- Heltidstillstånd utfärdat: 26 september 1975
- Fullständig licens: 26 september 1975
- Inledande kritik: 17 januari 1975
- Kommersiell verksamhet: 26 december 1975
- 100 % effekt: 20 mars 1976
- "Stretch power": 25 juni 1979
- Begärd förlängning av driftlicens: 22 december 1986
- Förlängning av drifttillstånd utfärdad: 12 januari 1988
- Heltidsdriftstillstånd löper ut: 11 december 2010
- Driftlicensen löper ut: 31 juli 2015
- Förlängt drifttillstånd löper ut: 31 juli 2035
Enhet 3
Millstone 3 är en Westinghouse-anläggning som började fungera 1986 och har en maximal effekt på 3650 MWth (1260 MWe). Sommaren 2008 godkände NRC en effektökning för enhet 3 som ökade dess elektriska effekt med 7,006 % till 3650 MWth (1230 MWe). Höjningen trädde i kraft i slutet av 2008.
- Bygglov utfärdat: 9 augusti 1974
- Ursprunglig kritik: 23 januari 1986
- Kommersiell verksamhet: 23 april 1986
- Driftlicensen löper ut: 25 november 2025
- Förlängt drifttillstånd löper ut: 25 november 2045
Elproduktion
År | Jan | feb | Mar | apr | Maj | jun | jul | aug | sep | okt | nov | dec | Årlig (totalt) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2001 | 1,366,126 | 620,610 | 643 005 | 1,368,619 | 1,342,326 | 1,441,469 | 1,464,628 | 1,396,871 | 1,435,437 | 1,491,469 | 1,372,527 | 1,484,680 | 15,427,767 |
2002 | 1,477,462 | 1 020 136 | 850 042 | 1,159,749 | 1 497 037 | 1,421,445 | 1,484,163 | 1,292,391 | 750 180 | 1,251,934 | 1,453,640 | 1 260 093 | 14,918,272 |
2003 | 1,447,607 | 1,364,927 | 1 087 699 | 1,458,326 | 1,509,611 | 1,419,320 | 1,496,738 | 1,485,570 | 1,442,531 | 1 052 843 | 823,382 | 1,489,541 | 16 078 095 |
2004 | 1,514,725 | 1,416,949 | 1,357,314 | 669,780 | 1,198,434 | 1,466,127 | 1 500 558 | 1,494,418 | 1,455,788 | 1,514,313 | 1,435,926 | 1,514,765 | 16,539,097 |
2005 | 1,517,951 | 1,371,151 | 1,512,889 | 615,298 | 1 098 080 | 1,464,341 | 1,506,553 | 1,497,980 | 1,406,057 | 719,636 | 1,459,379 | 1,392,807 | 15,562,122 |
2006 | 1,519,136 | 1,308,343 | 1,518,458 | 1,280,682 | 1,516,725 | 1,463,454 | 1,502,444 | 1,498,380 | 1,453,911 | 959,234 | 1 055 264 | 1,513,415 | 16,589,446 |
2007 | 1,413,243 | 1,365,236 | 1,510,387 | 790 130 | 959 038 | 1,454,548 | 1,498,812 | 1,493,112 | 1,446,523 | 1,497,311 | 1,456,391 | 1,501,411 | 16,386,142 |
2008 | 1,506,855 | 1,407,918 | 1,503,666 | 923,531 | 1 032 094 | 1,394,073 | 1,463,357 | 1,484,185 | 1,440,365 | 940,798 | 771,358 | 1,564,746 | 15,432,946 |
2009 | 1,568,502 | 1,416,776 | 1,560,557 | 1,518,510 | 1 566 800 | 1,512,957 | 1 086 929 | 1,546,944 | 1,502,156 | 1 034 216 | 1,130,862 | 1,212,173 | 16,657,382 |
2010 | 1,403,129 | 1,368,339 | 1,560,238 | 918,593 | 947 990 | 1,518,345 | 1,561,523 | 1,446,144 | 1,506,738 | 1,565,484 | 1 425 006 | 1,528,775 | 16 750 304 |
2011 | 1,573,286 | 1,417,144 | 1,571,839 | 927,458 | 1,501,912 | 1,438,058 | 1,555,841 | 1,499,191 | 1,189,238 | 858,702 | 823,268 | 1 571 900 | 15,927,837 |
2012 | 1,557,888 | 1,455,944 | 1,570,928 | 1,518,162 | 1,546,933 | 1,512,620 | 1,528,126 | 1 287 047 | 1,491,488 | 1 015 837 | 1 024 275 | 1,568,639 | 17,077,887 |
2013 | 1,570,408 | 1,418,239 | 1,568,407 | 1 006 680 | 998,334 | 1,513,501 | 1,554,382 | 1,396,122 | 1 500 677 | 1,552,489 | 1,434,929 | 1,565,414 | 17,079,582 |
2014 | 1,547,921 | 1,370,137 | 1,564,866 | 984,611 | 915,374 | 1,433,769 | 1,456,260 | 1,545,219 | 1,492,737 | 957,780 | 1 003 232 | 1,568,713 | 15 840 619 |
2015 | 1,569,302 | 1,416,474 | 1,566,390 | 1 386 998 | 1,564,086 | 1,511,809 | 1,555,196 | 1,548,421 | 1,494,525 | 963 025 | 1,278,219 | 1,556,472 | 17,410,917 |
2016 | 1,395,804 | 1,453,731 | 1,553,691 | 870 970 | 1 042 398 | 1,157,289 | 1,545,157 | 1,465,939 | 1,492,559 | 1,541,912 | 1,502,398 | 1,553,644 | 16,575,492 |
2017 | 1,552,802 | 1,405,299 | 1,549,445 | 888 022 | 1,440,352 | 1,499,861 | 1,540,401 | 1,532,203 | 1,488,432 | 974,762 | 1 069 696 | 1,558,346 | 16,499,621 |
2018 | 1,562,198 | 1,408,160 | 1,557,604 | 1,503,520 | 1 550 957 | 1 500 266 | 1 538 028 | 1,528,480 | 1,397,258 | 907,772 | 887,693 | 1,539,556 | 16,881,492 |
2019 | 1,556,867 | 1,406,987 | 1,549,156 | 755 800 | 1 035 404 | 1,502,805 | 1,537,561 | 1,535,968 | 1,486,081 | 1 540 270 | 1 500 314 | 1,326,185 | 16,733,398 |
2020 | 1,555,862 | 1,460,856 | 1,559,892 | 985,158 | 912,169 | 1,380,637 | 1 544 050 | 1,511,859 | 1,492,689 | 664 016 | 1,135,412 | 1,512,255 | 15,714,855 |
2021 | 1,399,646 | 1,413,362 | 1,565,742 | 1,513,226 | 1,561,563 | 1,261,548 | 1,547,127 | 1,527,962 | 1,488,664 | 1 036 856 | 1,341,626 | 1,559,187 | 17,216,509 |
2022 | 1,423,440 | 1,408,875 | 1,556,974 | 802 500 | 644,649 | 1,385,138 | 1,551,414 | 1,546,783 | 1,494,689 | 1,557,614 | 13,372,076 | ||
2023 |
Säkerhets- och miljöevenemang
I december 1977 inträffade två väteexplosioner vid anläggningen. Den andra explosionen skadade en man som krävde sjukhusvård.
I oktober 1990 orsakade operatörsfel under ett rutintest en avstängning av enhet 2.
I september 1991 underkände tjugo reaktoroperatörer de obligatoriska licensundersökningarna. Bristen på licensierade operatörer nödvändiggjorde en nedläggning av enhet 1 fram till mars 1992.
1995 inledde US Nuclear Regulatory Commission en säkerhetsutredning angående tankningsprocedurer vid Millstone enhet 1, baserad på information från George Galatis , en senior kärnteknisk ingenjör .
Den 26 februari 1996 tvingade en läckande ventil att stänga av enheterna 1 och 2. Flera utrustningsfel hittades. Tidningen Time presenterade anläggningen på omslaget och kallade dess operatör för ett "skurknyttigt verktyg", och Nuclear Regulatory Commission pekade ut Millstone för ytterligare uppmärksamhet. Också 1996 släppte anläggningen en gallon per timme av hydrazin i Long Island Sound. Anläggningens operatörer dömdes 1999 för att ha förfalskat miljöregister relaterade till utsläppet av hydrazin.
Efter Time-artikeln och den efterföljande avstängningen av alla reaktorer, startade enhet 2 om den 11 maj 1999 och enhet 3 startade om den 1 juli 1998. Enhet 1 startades aldrig om eftersom kostnaden för att åtgärda många säkerhetsproblem var för hög.
År 2002 bötfälldes Millstones operatörer med 288 000 USD för att de inte hade redogjort för två uranbränslestavskomponenter som hade blivit felplacerade 30 år tidigare 1972.
stängdes Millstone enhet 3 på ett säkert sätt utan incidenter när ett kretskort som övervakade en ångtryckledning kortsluts , vilket gjorde att kortet inte fungerade och indikerar ett osäkert tryckfall i reaktorns ångsystem, när det i verkligheten fanns var inget fall i ångtrycket. Orsaken tillskrevs tenn morrhår på tavlan. Som svar på denna händelse implementerade Millstone en procedur för att inspektera dessa morrhår vid varje bränsleavbrott, eller 18 månader.
I september 2009 stängdes enhet 2 av när en åskväder orsakade strömfluktuationer. När arbetare försökte starta om enheten upptäckte de en liten läcka i reaktorns kylvätskepump. Den 21 december 2009 löste Unit 3-reaktorn och stängdes av i mer än 72 timmar. Den 27 juli 2009 löste Unit 2-reaktorn och stängdes av i mer än 72 timmar. Den 9 augusti 2013 utlöstes och stängdes reaktorn i Unit 3 på grund av ett fel. 2016 stängdes enhet 3 efter en vätgasläcka.
Omgivande befolkning
Nuclear Regulatory Commission definierar två nödplaneringszoner runt kärnkraftverk: en plymexponeringsvägszon med en radie på 10 miles (16 km), som främst handlar om exponering för och inandning av luftburen radioaktiv kontaminering, och en intagsvägszon av cirka 50 miles (80 km), främst rörande intag av mat och vätska kontaminerade av radioaktivitet.
Den amerikanska befolkningen 2010 inom 10 miles (16 km) från Millstone var 123 482, en ökning med 29,5 procent på ett decennium, enligt en analys av amerikanska folkräkningsdata för msnbc.com. 2010 års befolkning inom 50 miles (80 km) var 2 996 756, en ökning med 9,5 procent sedan 2000. Städer inom 50 miles inkluderar Hartford (41 miles till centrum) och New Haven (43 miles till centrum).
Seismisk risk
Nuclear Regulatory Commissions uppskattning av risken varje år för en jordbävning som är tillräckligt intensiv för att orsaka härdskador på reaktorn vid Millstone var 1 av 90 909 för reaktor 2 och 1 av 66 667 för reaktor 3, enligt en NRC-studie publicerad i augusti 2010.