Millstone kärnkraftverk

Millstone kraftverk
HD.6D.129 (10821944423).jpg
Land
  • Förenta staterna
Plats Waterford , New London County , Connecticut
Koordinater Koordinater :
Status Operativ
Bygget började

Enhet 1: 1 maj 1966 Enhet 2: 1 november 1969 Enhet 3: 9 augusti 1974
kommissionens datum

Enhet 1: 1 mars 1971 Enhet 2: 26 december 1975 Enhet 3: 23 april 1986
Avvecklingsdatum Enhet 1: 1 juli 1998
Konstruktions kostnader 8,845 miljarder USD (2007 USD, endast enheter 2–3 )
Ägare Dominion Energy
Operatör(er) Dominion Energy
Kärnkraftverk
Typ av reaktor
Enhet 1: BWR Enhet 2–3: PWR
Reaktorleverantör

Enhet 1: General Electric Enhet 2: Combustion Engineering Enhet 3: Westinghouse
Kylkälla Long Island Sound
Termisk kapacitet

1 × 2011 MW th (avvecklad) 1 × 2700 MW th 1 × 3650 MW th
Kraftproduktion
Enheter i drift
1 × 869 MW 1 × 1229 MW
Märke och modell

Enhet 1: BWR-4 (Mark 1) Enhet 2: CE 2-loop (DRYSUB) Enhet 3: WH 4-loop (DRYSUB)
Enheter avvecklade 1 × 641 MW
Namnskyltens kapacitet 2098 MW
Kapacitetsfaktor
89,99 % (2017) 71,23 % (livstid)
Årlig nettoproduktion 17 216 GWh (2021)
externa länkar
Hemsida Millstone kraftverk
Commons Relaterade medier på Commons

Millstone Nuclear Power Station är det enda kärnkraftverket i Connecticut och det enda kärnkraftverket med flera enheter i New England . Det ligger vid ett före detta stenbrott (från vilket det har fått sitt namn) i Waterford . Med en total kapacitet på över 2 GW producerar stationen tillräckligt med el för att driva cirka 2 miljoner hem. Driften av Millstone Power Station stöder mer än 3 900 jobb och genererar motsvarande över hälften av den el som förbrukas i Connecticut.

Millstone-platsen täcker cirka 500 tunnland (2 km²). Kraftproduktionskomplexet byggdes av ett konsortium av kraftverk som använder Long Island Sound som en källa för sekundär sidokylning. Millstone Units 2 och 3, båda tryckvattenreaktorer (en från Westinghouse och en från Combustion Engineering ), såldes till Dominion Resources av Northeast Utilities 2000 och fortsätter att fungera.

Anläggningen har haft ett flertal säkerhetsrelaterade avstängningar och ibland fått förstärkt undersökningsstatus av Nuclear Regulatory Commission . 1999 Northeast Utilities , anläggningens dåvarande operatör, med på att betala 10 miljoner dollar i böter för 25 fall av ljugit för federala utredare och för att ha förfalskat miljörapporter. Dess dotterbolag, Northeast Nuclear Energy Company, betalade ytterligare 5 miljoner dollar för att ha gjort 19 falska uttalanden till federala tillsynsmyndigheter angående främjandet av okvalificerade anläggningsoperatörer mellan 1992 och 1996.

Den 28 november 2005, efter en 22-månaders ansöknings- och utvärderingsprocess, beviljades Millstone en 20-årig licensförlängning för både enhet 2 och 3 av NRC.

Licenshistorik och milstolpar

Arbete utförs på inneslutningsstrukturen vid Millstone Nuclear Power Plant.

Enhet 1

Millstone 1 var en General Electric kokvattenreaktor , som producerade 660 MWe , stängdes av i november 1995 innan den stängdes permanent i juli 1998.

  • Bygglov utfärdat: 1966-05-19
  • Slutlig säkerhetsanalys inlämnad: 1 november 1968
  • Provisoriskt drifttillstånd utfärdat: 7 oktober 1970
  • Heltidsdriftstillstånd utfärdat: 31 oktober 1986
  • Fullständig licens: 7 oktober 1970
  • Inledande kritik: 26 oktober 1970
  • Synkroniserad till nätet: november 1970
  • Kommersiell verksamhet: 28 december 1970
  • 100 % effekt: 6 januari 1971
  • US Nuclear Regulatory Commission inledde en säkerhetsutredning angående tankningsprocedurer, baserad på information från George Galatis , en senior kärnkraftsingenjör, 1995.
  • Läckande ventil tvingad avstängning flera utrustningsfel upptäcktes: 20 februari 1996
  • Permanent upphörd verksamhet: 21 juli 1998

Enhet 2

Millstone 2 är en förbränningsteknisk tryckvattenreaktoranläggning byggd på 1970-talet och har en maximal effekt på 2700 termiska megawatt, eller MWth (870 MWe). Den har 2 ånggeneratorer och 4 reaktorkylningspumpar. Det genomgår en uppgradering av sitt säkra avstängningssystem som redan uppfyllde NRC-standarderna. Under tankningsavbrottet i oktober 2006 installerade operatören en ny tryckanordning.

  • Bygglov utfärdat: 11 december 1970
  • Slutlig säkerhetsanalysrapport inlämnad: 15 augusti 1972
  • Heltidstillstånd utfärdat: 26 september 1975
  • Fullständig licens: 26 september 1975
  • Inledande kritik: 17 januari 1975
  • Kommersiell verksamhet: 26 december 1975
  • 100 % effekt: 20 mars 1976
  • "Stretch power": 25 juni 1979
  • Begärd förlängning av driftlicens: 22 december 1986
  • Förlängning av drifttillstånd utfärdad: 12 januari 1988
  • Heltidsdriftstillstånd löper ut: 11 december 2010
  • Driftlicensen löper ut: 31 juli 2015
  • Förlängt drifttillstånd löper ut: 31 juli 2035

Enhet 3

Millstone 3 är en Westinghouse-anläggning som började fungera 1986 och har en maximal effekt på 3650 MWth (1260 MWe). Sommaren 2008 godkände NRC en effektökning för enhet 3 som ökade dess elektriska effekt med 7,006 % till 3650 MWth (1230 MWe). Höjningen trädde i kraft i slutet av 2008.

  • Bygglov utfärdat: 9 augusti 1974
  • Ursprunglig kritik: 23 januari 1986
  • Kommersiell verksamhet: 23 april 1986
  • Driftlicensen löper ut: 25 november 2025
  • Förlängt drifttillstånd löper ut: 25 november 2045

Elproduktion

Generering ( MWh ) av Millstone Power Station
År Jan feb Mar apr Maj jun jul aug sep okt nov dec Årlig (totalt)
2001 1,366,126 620,610 643 005 1,368,619 1,342,326 1,441,469 1,464,628 1,396,871 1,435,437 1,491,469 1,372,527 1,484,680 15,427,767
2002 1,477,462 1 020 136 850 042 1,159,749 1 497 037 1,421,445 1,484,163 1,292,391 750 180 1,251,934 1,453,640 1 260 093 14,918,272
2003 1,447,607 1,364,927 1 087 699 1,458,326 1,509,611 1,419,320 1,496,738 1,485,570 1,442,531 1 052 843 823,382 1,489,541 16 078 095
2004 1,514,725 1,416,949 1,357,314 669,780 1,198,434 1,466,127 1 500 558 1,494,418 1,455,788 1,514,313 1,435,926 1,514,765 16,539,097
2005 1,517,951 1,371,151 1,512,889 615,298 1 098 080 1,464,341 1,506,553 1,497,980 1,406,057 719,636 1,459,379 1,392,807 15,562,122
2006 1,519,136 1,308,343 1,518,458 1,280,682 1,516,725 1,463,454 1,502,444 1,498,380 1,453,911 959,234 1 055 264 1,513,415 16,589,446
2007 1,413,243 1,365,236 1,510,387 790 130 959 038 1,454,548 1,498,812 1,493,112 1,446,523 1,497,311 1,456,391 1,501,411 16,386,142
2008 1,506,855 1,407,918 1,503,666 923,531 1 032 094 1,394,073 1,463,357 1,484,185 1,440,365 940,798 771,358 1,564,746 15,432,946
2009 1,568,502 1,416,776 1,560,557 1,518,510 1 566 800 1,512,957 1 086 929 1,546,944 1,502,156 1 034 216 1,130,862 1,212,173 16,657,382
2010 1,403,129 1,368,339 1,560,238 918,593 947 990 1,518,345 1,561,523 1,446,144 1,506,738 1,565,484 1 425 006 1,528,775 16 750 304
2011 1,573,286 1,417,144 1,571,839 927,458 1,501,912 1,438,058 1,555,841 1,499,191 1,189,238 858,702 823,268 1 571 900 15,927,837
2012 1,557,888 1,455,944 1,570,928 1,518,162 1,546,933 1,512,620 1,528,126 1 287 047 1,491,488 1 015 837 1 024 275 1,568,639 17,077,887
2013 1,570,408 1,418,239 1,568,407 1 006 680 998,334 1,513,501 1,554,382 1,396,122 1 500 677 1,552,489 1,434,929 1,565,414 17,079,582
2014 1,547,921 1,370,137 1,564,866 984,611 915,374 1,433,769 1,456,260 1,545,219 1,492,737 957,780 1 003 232 1,568,713 15 840 619
2015 1,569,302 1,416,474 1,566,390 1 386 998 1,564,086 1,511,809 1,555,196 1,548,421 1,494,525 963 025 1,278,219 1,556,472 17,410,917
2016 1,395,804 1,453,731 1,553,691 870 970 1 042 398 1,157,289 1,545,157 1,465,939 1,492,559 1,541,912 1,502,398 1,553,644 16,575,492
2017 1,552,802 1,405,299 1,549,445 888 022 1,440,352 1,499,861 1,540,401 1,532,203 1,488,432 974,762 1 069 696 1,558,346 16,499,621
2018 1,562,198 1,408,160 1,557,604 1,503,520 1 550 957 1 500 266 1 538 028 1,528,480 1,397,258 907,772 887,693 1,539,556 16,881,492
2019 1,556,867 1,406,987 1,549,156 755 800 1 035 404 1,502,805 1,537,561 1,535,968 1,486,081 1 540 270 1 500 314 1,326,185 16,733,398
2020 1,555,862 1,460,856 1,559,892 985,158 912,169 1,380,637 1 544 050 1,511,859 1,492,689 664 016 1,135,412 1,512,255 15,714,855
2021 1,399,646 1,413,362 1,565,742 1,513,226 1,561,563 1,261,548 1,547,127 1,527,962 1,488,664 1 036 856 1,341,626 1,559,187 17,216,509
2022 1,423,440 1,408,875 1,556,974 802 500 644,649 1,385,138 1,551,414 1,546,783 1,494,689 1,557,614 13,372,076
2023

Säkerhets- och miljöevenemang

I december 1977 inträffade två väteexplosioner vid anläggningen. Den andra explosionen skadade en man som krävde sjukhusvård.

I oktober 1990 orsakade operatörsfel under ett rutintest en avstängning av enhet 2.

I september 1991 underkände tjugo reaktoroperatörer de obligatoriska licensundersökningarna. Bristen på licensierade operatörer nödvändiggjorde en nedläggning av enhet 1 fram till mars 1992.

1995 inledde US Nuclear Regulatory Commission en säkerhetsutredning angående tankningsprocedurer vid Millstone enhet 1, baserad på information från George Galatis , en senior kärnteknisk ingenjör .

Den 26 februari 1996 tvingade en läckande ventil att stänga av enheterna 1 och 2. Flera utrustningsfel hittades. Tidningen Time presenterade anläggningen på omslaget och kallade dess operatör för ett "skurknyttigt verktyg", och Nuclear Regulatory Commission pekade ut Millstone för ytterligare uppmärksamhet. Också 1996 släppte anläggningen en gallon per timme av hydrazin i Long Island Sound. Anläggningens operatörer dömdes 1999 för att ha förfalskat miljöregister relaterade till utsläppet av hydrazin.

Efter Time-artikeln och den efterföljande avstängningen av alla reaktorer, startade enhet 2 om den 11 maj 1999 och enhet 3 startade om den 1 juli 1998. Enhet 1 startades aldrig om eftersom kostnaden för att åtgärda många säkerhetsproblem var för hög.

År 2002 bötfälldes Millstones operatörer med 288 000 USD för att de inte hade redogjort för två uranbränslestavskomponenter som hade blivit felplacerade 30 år tidigare 1972.

stängdes Millstone enhet 3 på ett säkert sätt utan incidenter när ett kretskort som övervakade en ångtryckledning kortsluts , vilket gjorde att kortet inte fungerade och indikerar ett osäkert tryckfall i reaktorns ångsystem, när det i verkligheten fanns var inget fall i ångtrycket. Orsaken tillskrevs tenn morrhår på tavlan. Som svar på denna händelse implementerade Millstone en procedur för att inspektera dessa morrhår vid varje bränsleavbrott, eller 18 månader.

I september 2009 stängdes enhet 2 av när en åskväder orsakade strömfluktuationer. När arbetare försökte starta om enheten upptäckte de en liten läcka i reaktorns kylvätskepump. Den 21 december 2009 löste Unit 3-reaktorn och stängdes av i mer än 72 timmar. Den 27 juli 2009 löste Unit 2-reaktorn och stängdes av i mer än 72 timmar. Den 9 augusti 2013 utlöstes och stängdes reaktorn i Unit 3 på grund av ett fel. 2016 stängdes enhet 3 efter en vätgasläcka.

Omgivande befolkning

Nuclear Regulatory Commission definierar två nödplaneringszoner runt kärnkraftverk: en plymexponeringsvägszon med en radie på 10 miles (16 km), som främst handlar om exponering för och inandning av luftburen radioaktiv kontaminering, och en intagsvägszon av cirka 50 miles (80 km), främst rörande intag av mat och vätska kontaminerade av radioaktivitet.

Den amerikanska befolkningen 2010 inom 10 miles (16 km) från Millstone var 123 482, en ökning med 29,5 procent på ett decennium, enligt en analys av amerikanska folkräkningsdata för msnbc.com. 2010 års befolkning inom 50 miles (80 km) var 2 996 756, en ökning med 9,5 procent sedan 2000. Städer inom 50 miles inkluderar Hartford (41 miles till centrum) och New Haven (43 miles till centrum).

Seismisk risk

Nuclear Regulatory Commissions uppskattning av risken varje år för en jordbävning som är tillräckligt intensiv för att orsaka härdskador på reaktorn vid Millstone var 1 av 90 909 för reaktor 2 och 1 av 66 667 för reaktor 3, enligt en NRC-studie publicerad i augusti 2010.